| (above) the bunker prior to work starting |
![]() |
| (above) following excavation and initial shaping. There would later be a berm added at the top to divert water runoff away from the bunker. |
![]() |
| After shaping but before the berm was added. The yellow circle is the area that will be further excavated and filled with sand. |
![]() |
| Another view of the reshaped bunker |