Work continues on renovating the right front bunker on #10.  Today, Alex continued the process of working the edges of the bunker to build the base contour that will be needed to lay sod and build the new faces of the bunker.  This involves cutting every edge of the bunker to allow recontouring.


(Above) Alex uses the sand pro to work dirt up into the face of the old bunker.  Most of the face will be sodded and the only sand will be at the bottom of the bunker.


Alex uses the mini excavator to dig out the existing bunker and repurpose the soil for the banks of the newly rebuilt bunker


Alex works on the lower edge of the bunker.  Instead of being a steep drop off into the bunker, the new lower edge will be sloped gradually into the trap and will be surfaced with zoysia sod.


Jay hand digs the one "oops" that we've uncovered so far.  This is a 4" water line that we didn't realize was buried just outside the existing bunker. The good news is that its location won't require us to move it in order to compete the renovation.