Friday, December 2, 2011

Bunker work continues

Work continues on the right front bunker on hole #1.  The major shaping is completed and in the first three pictures below the white outer line indicates the approximate shape that will eventually be the sand portion of the bunker.  Everything outside that line will be sodded with grass.  The white line you see through the center of the oval is where the drain will be installed.

Looking over the bunker to the green, everything inside the white line will be sand.  Outside the white line will be grass.  The white line through the center indicates the drain location.

Another view of the reshaped bunker.  Notice that we've also added a small berm to the upper side of the shape to aid in diverting water away from the bunker.
And another view, looking back toward the fairway.  The berm is also evident in this photo.




The excavator is used to dig out a pocket for the area that will be the sand portion of the bunker.




Another view of the excavated area with the drain ready to install