Tuesday, November 29, 2011

Bunker on #1

Today Alex and his crew began the reconstruction of the right front bunker on hole #1.  Who among you hasn't wanted to do this at some time?


The design of this bunker with the steeply flashed faces caused on-going maintenance issues for us.  Every time we had a hard rain water would run off the green and down the face of the bunker, washing the sound out and exposing the soil below it.  In time the soil mixed with the sand, contaminating it so that it would not drain and become more "dirt" than "sand".   Our modification is going to involve sloping the bunker sides more, and covering them with sod (grass) rather than attempting to keep sand flashed up on them.  The result will be a bunker that isn't subject to the wash-out problems that it has been up to this point.

Visit YouTube http://www.youtube.com/watch?v=ifXv6SpCL1I&feature=youtube_gdata for a short video of the excavation.


In the picture above you can see that the drain is nearly three feet below the surface.  It should be only a few inches under the sand.  Repeated wash outs actually resulted in restructuring of the bunker.

 


In the above photo you can see the new shape is beginning to take form.  The load of dirt you see being dumped, along with several more loads, will be used to create a slight berm around the upper lip of the bunker.  This will also help divert water from running into the bunker.
The red outline drawn on the picture is the approximate size and location of the sand portion of the bunker.  The areas outside the red line will be sodded with zoysia.



A slightly different view of the mostly finished bunker.  The black pipe you see is the drain tile.  Once final shaping is completed new drains will be excavated in the bottom of the bunker and attached to this drain pipe.




Friday, September 9, 2011

green repairs

Everyone knows that the extended heat this summer was hard on golf greens throughout the midwest.  Despite our best efforts, Lake Valley did not escape untouched either.  Today, Alex and his crew were busy stealing sod from the lower level of the practice green to replace the worst spots on about three of our greens.  They started today by patching in sod into the worst spots on #14 green, and will continue the process next week on greens #9 and #15.

Why don't they seed it, you ask?  Actually, we did.  Twice.  Unfortunately, each time the seed germinated and just began to grow we were hit with another series of 100-degree weather and the new plants simply weren't strong enough to survive.  To counter that, Alex decided to go with "instant gratification" by laying in sod on the worst spots.  Another problem with growing from seed is that you almost need to close the green to allow the new grass to properly mature, an option that really isn't available to us.

I'm posting a few pictures from Friday afternoon to give you an idea of what is happening:

click picture for larger image
In the above picture you can see some of the sod that has been stripped in, as well as some plugs that were taken from the outer perimeter of the green.


(Above) Alex is spreading a light coat of sand on the seams and lower areas of the patched green.  These will be broomed in similar to a very light top dressing.



Above you see Kevin and Kelly taking plugs from the back outer edge of the green and replacing small areas, while Alex is spreading a light sand dressing and Jay uses a soft bristle broom to sweep the sand in.  After his process was finished they ran the vibratory rollers over the green to smooth everything as much as possible.  On Monday the entire green will receive a full top dressing.

.

Wednesday, August 31, 2011

And then it was gone......

Wednesday afternoon, August 31, 2011.  The bunker behind #10 green is no more.  Final grading and cleanup was done this morning, followed by the laying of sod. 

Here Lashley, Jay, and Alex work on the final clean up and preparations prior to laying the new sod.  You can also see the pattern that has been mown into the surrounding area.




From the side you can see the newly sodded area as well are the surrounding area which will all be mown at the same height as the collars.



Looking from the front of the green you can again see the newly sodded area and the outline of the area which will all be mown at collar height.

Monday, August 29, 2011

Rear Bunker on #10

From behind #10 gren you can see the fill material beginning to replace the bunker.   (Click images for larger version)
You've heard us promise..... today, we started filling in the bunker behind #10 green.  It is currently being filled with the material that was stockpiled when Jay built the new beds by #12 tee.  This material is good for fill, but not satisfactory for surface.  To that end Alex has another stockpile of sandy/loamy material that will be used for the top ~4".  We will then stod the surface and once it is established we will begin the process of training the grass to be mown at the same height as the green collar.

In the above image the red line defines approximately the area that will be mown at the same height as the green collar.  This will give a ball that is over the green a chance to be putted or chipped with a reasonable chance of keeping it on the green.  I'll also point out that the bunker will be completely filled in - it will NOT be a grass bunker, but instead will be just a smooth area on the mounds.

It will take some time for the sod to establish and for the mowing to "train" the grass to be cut so tightly, but by next season we should have a very nice area behind 10 green.

Thursday, August 4, 2011

Good news and...bad news/good news


This tree on the right side of #4 was severely damaged by winds about 5:30am on August 4th, 2011 (Click picture to see full size)
 We've got good news....this morning for the first time in a long time we received measurable precipitation, about 3" in fact, as a front passed through and the temperatures dropped from the triple digits they've been for the past several days.

The bad news, or maybe more good news, depending on how you feel about it, is that the high winds that accompanied the front blew out about half of this tree that stands at the right side of the fairway on #4 just as it crosses the creek.  If you enlarge the picture (click on it) you'll notice that the portion of the tree that is remaining upright is split in half.  Initial assessment tells us that the tree will have to be removed completely.

Thursday, July 28, 2011

Beautiful morning

It's another beautiful morning at Lake Valley.  06:43 and the practice green is getting a little water as the sun tops the horizon and shows through the trees.

Friday, July 22, 2011

Patience Please!

Currently its 102 here...107 heat index.....My bentgrass greens cut at .125 inches are holding up fairly well...gotta LOVE summertime...

The message above was posted on a social media site by our Superintendent.  There are a few things to point out about this simple message.  First, in case you didn't notice, it's HOT!  With low overnight temps only dropping to about 80, the course really hasn't been getting much of a chance to recover before it heads back into another scorching day.  Continuous high temperatures are very stressful on turf, especially bentgrass greens that are mowed to very low heights.  We play a huge balancing game to try and keep the course conditioned the way golfers like it and still maintain the health of the turf. 

Because of the extreme heat, it is very likely that you will see greens being watered to cool them down, especially during afternoon heat.  If you are playing and see a member of the grounds crew hand watering your green, or if the irrigation is on, please be patient.  Don't hit into them unless they wave you on and are watching.  It will only take them a few minutes to syringe the green and they'll be gone and out of your way.  It certainly isn't worth the risk of seriously injuring someone who is only trying to maintain the golf course for your benefit.